Non-Complex Sites

Pictures for the People produced a detailed submission film for Kier, showcasing its work across two non-complex sites: Elton Reservoir in Manchester and the Leicestershire Towpath. The film provides an in-depth look at the projects, from emergency embankment repairs and reservoir monitoring to the resurfacing and improvement of 1.7 kilometres of towpath. It also demonstrates Kier’s approach to site management, safety, environmental responsibility, and working effectively within challenging conditions. Explore more projects in construction, engineering, and infrastructure video production here.

Showcasing Safe, Sustainable Project Delivery

The film takes audiences behind the scenes at both sites, highlighting the practical measures Kier put in place to manage complex access requirements, public interfaces, site security, and environmental risks. At Elton Reservoir, the team responded to an embankment failure, monitored ground conditions, and planned new drainage infrastructure to maintain the reservoir’s stability. Along the Leicestershire Towpath, the project team created a new sealed surface designed to remain accessible during flooding, while reusing materials on site to reduce costs and environmental impact. The result is a comprehensive project film demonstrating Kier’s commitment to safe, efficient, and sustainable construction practices. For video production that communicates construction projects, engineering expertise, and responsible project delivery, get in touch with our team.